Windsor-Detroit Borderlink operates the Canadian side of the Detroit–Windsor Tunnel, the only underwater international passenger vehicle crossing in the world. Maintaining this vital infrastructure requires high standards of reliability and safety. Borderlink was experiencing increasing maintenance challenges with their aging blower drive systems—an essential part of the tunnel’s ventilation system.
About 2 months.
Client: Borderlink
1 - Project Manager
1 - IT Manager
3 - Electricians
2 - Station Operators
ONYX Engineering
2 - Controls Engineers
Control System Design & Engineering
SCADA programming
PLC programming
Installation
Start-up and commissioning
Rockwell Factorytalk SE
Rockwell Factorytalk GuardianAI
Rockwell RSLogix5000
Rockwell Powerflex 755T and 525 Variable Frequency Drives
Ethernet/IP Industrial Network